Keith Butterfield, Yacht and Marine Surveyor. Costa del Sol, Spain.

Of primary importance is the yards ability to carry out the task. Checks on the yards installations, procedures, supply of materials and suitability of their equipment to the task are necessary benchmarks to be met. As well as the standard of training and certificated competence of the personnel involved in the construction. Individuals should be identified and their coding assessed. Attention is required to the preparation of any jigs required by the construction – such as, jigs to align plates and structures to be welded.

When/if defects are identified in hull or machinery and/or pieces of equipment which affects the vessel, remedial measures and/or appropriate recommendations/conditions are to be specified. Ultimately it is the surveyors external and internal inspections of the hull, machinery and equipment that determine the condition of the ship.

According to the size and type of construction, examinations are supplemented with non-destructive testing (NDT) as and where considered necessary. Any jointing of dissimilar metals, for example – steel hull to aluminium superstructure, require close attention. Another important part of construction is consideration of the transmission of static loads upon the hulk of the hull as it is constructed – jigs, blocks and supports need to take account of the loading/bending forces on the hulk as material and installations are being added

Welding requirements – The yards equipment, materials and consumables to be checked and suitability verified. The surveyor must be satisfied with the standard of welding. All hull and major component welds to be visually inspected on both sides where feasible, and specific areas (difficult to access areas, overhead welds, areas of high loading) are to be identified for specific NDT procedures. The results and procedure of NDT is to be overseen and reviewed. All reports are to be submitted to the surveyor. Welds in alloy steels are not inspected for 48 hours after completion and the manufacturers own welding inspection processes should have been completed prior to the surveyors inspection.