Keith Butterfield, Yacht and Marine Surveyor. Costa del Sol, Spain.
The sender unit is mounted to the tank-top, usually via bolts and sealed with a gasket. Remove the unit and inspect it.
The float on the end of the arm should be intact and capable of floating. The arm should move freely. The rheostat should read correctly: that is, when the arm is all the way down, the rheostat should measure near zero ohms. When the arm is at the upper (90 degree) position, it should read close to 200 ohms. If any of these are not functioning correctly, the sending unit should be replaced.
If the sending unit is to be replaced, these units often need to be modified/adjusted to fit a particular tank. Three adjustments need to be made: 1) The vertical arm needs to be fitted to tank depth. Most over-the-counter units come in 24”/65cm depths, and are designed to be cut with a hacksaw to the tank depth. 2) The float arm may be overlong, and will need to have the float bent at 90 degrees to compensate for less-wide tanks. 3) The rheostat may need to be adjusted as per manufacturers recommendations to read ‘empty’ and ‘full’ accurately.